Engineering Library | Additive Manufacturing Resources | Chatelet
The Chatelet Engineering Library
Design guides, material references, process comparisons, and real production case studies — written by the people running 85+ production printers, for the engineers specifying the parts. No gated PDFs, no lead-capture walls.
Start With Your Problem
Most engineers don't arrive searching for a process. They arrive with a situation.
Design Guides
How to design parts that work the first time in production additive.
Design for Additive Manufacturing (DfAM)
Orientation and anisotropy, wall thickness, tolerances, fastening, stress geometry, overhangs, and the pre-RFQ checklist.
Design GuideThreaded Inserts in Printed Parts
Why printed threads strip, how to size insert bosses, and the fastening alternatives worth knowing.
Material GuideCarbon Fiber Nylon: Engineer's Guide
Applications, design rules, and the honest limits of PA-CF in production.
Materials Database
What each production material is actually for — with typical published values and datasheets on request.
Glass Filled Nylon
Stiff, dimensionally stable, electrically insulating. The workhorse for fixtures, enclosures, and structural brackets.
PA-CFCarbon Fiber Nylon
Maximum stiffness-to-weight for robotics, handheld tooling, and metal replacement.
ASAASA for Outdoor Parts
UV-stable, weather-resistant. The only FDM material we recommend for permanent outdoor service.
Selection GuideBest Plastic for Outdoor Use
What survives sun and weather, what fails and why, and how to choose when the part also carries load.
PCPolycarbonate
Heat and impact resistance where nylons and ASA reach their limits.
TPUTPU (Flexible)
Gaskets, grips, dampeners, and sealing components in production quantities.
IndexAll Materials
The complete stocked production material list.
Manufacturing Methods & Comparisons
Honest process selection — including the cases where printing loses.
Manufacturing Method Selector
Four questions: print, machine, or mold? Includes when the answer isn't us.
Cost Analysis3D Printing vs Injection Molding
Where the cost curves actually cross, and the four factors per-part comparisons miss.
ComparisonCarbon Fiber Nylon vs Aluminum
310 MPa vs ~95 MPa — and why the lighter material still wins for many parts.
ComparisonASA vs ABS
Mechanically similar, environmentally opposite. Which survives outdoors.
Cost AnalysisReplacing Machined Parts
How we evaluate machining-to-printing conversions, with the honest failure modes.
Production Services
What we actually manufacture, and at what scale.
Low Volume Production
10–5,000 units without tooling, MOQs, or machine-shop queues.
ServiceInjection Molding Alternative
Tooling-free production for buyers holding a five-figure mold quote.
ServiceBridge Manufacturing
Sellable parts during the 6–16 week tooling window.
ServiceJigs, Fixtures & Manufacturing Aids
Assembly fixtures, drill guides, CMM nests, and go/no-go gauges.
ServiceRobotic End-Effectors
Lightweight end-of-arm tooling for automation.
ReferenceFull Capabilities Sheet
Capacity, tolerances, materials, quality process, and lead times in one table.
Production Case Studies
Real programs with real numbers — including what we couldn't convert.
Five Machining Operations to Zero
A critical outdoor mounting component converted to direct ASA printing at 1,000–2,000 units per recurring run.
~75% SavingsCNC to Additive: Nylon 12 Spacers
Why simple-geometry machined parts are the fastest savings on a BOM.
30-Day LaunchBuckleBuddeez
Concept to sellable product in 30 days without tooling.
Product LaunchPlantDaddy
A hydroponic product to market in record time.
Still Not Sure? Send Us the Part.
Upload your CAD with quantity, load case, and environment. We'll return a manufacturability review and an honest process recommendation — typically within one business day.
Request a Quote or Design ReviewChatelet Manufacturing is a US-based contract manufacturer in the Orlando, Florida area, operating 85+ FDM production printers. We produce carbon fiber nylon, glass filled nylon, ASA, polycarbonate, PETG, and TPU parts from prototype through low-volume production, with turnaround as soon as one week depending on part complexity and volume.